About This Project

The Aloha Plaza will be an extension of the newly built Banyan Dining Hall and will include more seating and arrangements and offer an outdoor experience.

Old Cafeteria Demolition

Timeline and Updates of the Project

Completion Date

To be determined

Recent Updates

September 2023

Large trees have been planted on the site. Decorative concrete has been placed on most of the site. Steps leading up to the CAC have been demolished and are being prepared for a new concrete pour.

October 2023

Concrete pouring for streets and sidewalks is currently underway on the East side of the site, near CAC.
Jacobsen is preparing the sidewalks for a new seal coat.
Planter beds are being filled with topsoil in preparation for upcoming landscaping.
Asphalt will be patched in front of the ballroom in the upcoming weeks. Planting activities are focused on the outdoor dining area.
Turf installation is in its final stages and is expected to reach completion next week.
A final coat of paint is being applied to the outdoor dining area steel structure.