Science Building

Project Summary
Construction
Completion Date: December 2021
The new three-story building features flexible state-of-the-art teaching laboratories, research and support spaces, classrooms, in addition to other informal learning and collaboration spaces. It will be home to math and science instruction and replaces the General Classroom Building.
This building was raised roughly 36 inches to be above the flood plain. The roughly 42, 000-square-foot facility features eight classrooms, 22 labs, 24 offices and several informal learning areas.
Beam of Memory
BYU–Hawaii students, faculty, and staff signed their name on a beam in front of the Academic Advisory Center. On March 31, 2021 the beam was put in place on top of the Science Building.
1 of 7
Science Building: Beam of Memory #1
2 of 7
Science Building: Beam of Memory #2

3 of 7
Beam and Signatures #1

4 of 7
Beam and Signatures #2

5 of 7
The Beam of Memory #3

6 of 7
The Beam of Memory #4

7 of 7
The Beam of Memory #5
1
of
7
Project Gallery
1 of 36
GCB roof coming off.JPG
January 2020 - Demolition Permit has been Issued

2 of 36
Demolished GCB
April 2020 - General Classroom Building Demolition

3 of 36
The GCB is completely demolished
April 2020 - The General Classroom Building Demolition Completed

4 of 36
Leveling the Ground
April 2020 - Leveling the Ground

5 of 36
Leveling is in the Process
April 2020 - Leveling is in the Process
6 of 36
Overall Site of Science Building
October 19, 2020 - Science Building Construction Progress
7 of 36
Elevator Level 1 Walls
October 19, 2020 - Elevator Level 1 Walls
8 of 36
South Concrete Wall
October 19, 2020 - South Concrete Wall
9 of 36
Stair Level 1 Walls
October 19, 2020 - Stair Level 1 Walls

10 of 36
Science Building: Shear Wall
November 6, 2020 - Shear Wall Construction

11 of 36
Stair Level 1 Wall
November 6, 2020 - Stair Level 1 Wall Progress

12 of 36
Science Building Overall Site.jpg
November 6, 2020 - The Foundation is Covered with Stego Wraps

13 of 36
Science Building Progress
November 19, 2020 - The Foundation has been Poured, and the Shear Wall Level 3 and Stairs Level 2 Progress

14 of 36
The Stair Wall
December 7, 2020 - Stair Well and Elevator Shaft Progress

15 of 36
Science Building: Structural Steel
December 15, 2020 - Structural Steel Installation

16 of 36
The Elevator Wall: Concrete Installment
December 15, 2020 - The Elevator Wall: Concrete Installment
17 of 36
Steel Closeup
December 28, 2020 - Structural Steel Progress
18 of 36
Structural Steel Progress #1
Structural Steel Progress #1

19 of 36
Decking and Structural Steel
January 15, 2021 - Structural Steel is Three-stories High and Level 2 Has Metal Decking

20 of 36
Progress Photos
January 22, 2021 Level 2 Slab on Metal Deck and Shoring Preparation

21 of 36
Science Building Progress Photo
March 5, 2020 - Roof Steel Installation and Planter Walls Construction

22 of 36
Roof Steel and Decking #1
March 5, 2021 - The Building is Three-stories High with Metal Framing.

23 of 36
Science Building: Whole Construction Site
March 23, 2021 - Roofing Progress

24 of 36
Exterior Sheathing #1
April 2, 2021 - Exterior Sheathing Installation

25 of 36
Exterior Sheathing #2
April 2, 2021 - Exterior Sheathing Installation

26 of 36
Science Building: Progress
April 19, 2021 - Metal Layers Covering the Roof Progress

27 of 36
Scaffolding Erection and Curtain Wall Mullion Installation
April 30, 2021 - Scaffolding Erection, and Curtain Wall Mullion and EIFS Foam Installation
28 of 36
EIFS Weather Membrane, Foam, and Hard Coat Installation
June 4, 2021 - EIFS Weather Membrane, Foam, Hard Coat, Roofing Dry-In and Mechanical Duct Installation
29 of 36
EIFS Weather Membrane, Foam, and Hard Coat Installation #2
June 11, 2021 - Door Frame and Drywall Installation
30 of 36
EIFS Hard Coat, Curtain Wall Glazing, and PVC Roofing
June 18, 2021 - EIFS Hard Coat, Curtain Wall Glazing, and PVC Roofing Installation
31 of 36
Curtain Wall Installation and Glazing
June 25, 2021 - Curtain Wall Installation, Glazing, and Roofing Dry-In Installation
32 of 36
Exterior Painting
July 13, 2021 - EFIS Final Coding, Exterior Painting, and Windows Installation
33 of 36
Overall Update
August 6, 2021 - PVC Roofing and Clay Tiles Installation Progress and Elevator Installation

34 of 36
Front Steps
August 17, 2021 - Front Steps and Landscape Progress
35 of 36
The new Science Building MB (5).JPG
Photo by Munkhbayar (MB) Magvandorj, Ke Alaka'i photographer
36 of 36
The new Science Building BYUH-MB (6).JPG
Photo by Munkhbayar (MB) Magvandorj, Ke Alaka'i photographer