Project Summary
Construction
Completion Date: Summer 2022
Temple View Apartment Buildings D2 and D3 are two of the three structures for the first phase of the New Temple View Apartment project. These two buildings have the same structure like in the new TVA Building A1, with a little difference in the exterior. Like the new TVA Building A1, Buildings D2 and D3 were also constructed of insulated concrete forms (ICF) that overcome many of the challenges of the existing construction.
Each of these new TVA buildings contains 18 one-bedroom units (including one ADA-compliant unit) with ten two-bedroom units (including one ADA-compliant unit). All units have a refrigerator, stove/oven, microwave, washer/dryer, and ceiling fans.
Construction Gallery
D2 Building
1 of 38
TVA D2: Leveling
2 of 38
TVA Building D2 Slab Preparation.png
3 of 38
TVA Building D2: Plumbing Excavation
4 of 38
TVA Building D2: Overall
5 of 38
TVA Building D2: Plumbing
6 of 38
TVA Building D2: Plumbing Excavation
7 of 38
Building D2: Aerial
8 of 38
TVA D2: Elevator Pit
9 of 38
New TVA Building D2: Plumbing Backfilled
10 of 38
TVA Building D2: Overall
11 of 38
Building D2: Elevator Pit Finished
12 of 38
Preparing the Mat Slap
13 of 38
Termite Barrier
14 of 38
Termite Barrier
15 of 38
TVA Building D2: Preparing Slab for Placement
16 of 38
TVA Building A1: Barrier and Rebar
17 of 38
TVA Building D2: Slab Preparation
18 of 38
TVA Building D2: Concrete Layer
19 of 38
Concrete Placement in Process
20 of 38
TVA Building D2: New Update
21 of 38
TVA Building D3: New Update
22 of 38
Floor Slab
23 of 38
TVA Building D2: Steel Structure
24 of 38
TVA Building D2: Level 1 Walls
25 of 38
TVA Building D2: Level 1
26 of 38
Stairs and Elevator Shaft
27 of 38
ICF Walls
28 of 38
Structure and Elevator Shaft
29 of 38
Floor Joist
30 of 38
TVA Building D2: Wall Progress
31 of 38
ICF Blocks
32 of 38
Main Sensor
33 of 38
Aerial view of the D2 Complex
34 of 38
D2 Crane Work
35 of 38
D2 Exterior 11.7
36 of 38
02.27 TVA D2 Exterior & Pavilions
37 of 38
Construction Update TVA D2 and Pavilions 4-18-22
38 of 38
Construction Update TVA D2 April 2022
1
of
38
D3 Building
1 of 26
New TVA Building D3
2 of 26
Excavation #1
3 of 26
Excavation #2
4 of 26
TVA Building D3: Excavation
5 of 26
Excavation and Leveling
6 of 26
Preparing Mat Footing
7 of 26
Another Layer of Gravel
8 of 26
TVA Building D3: Base
9 of 26
TVA Building D3: Exterior Work
10 of 26
Fabric and Rebar
11 of 26
Preparation for Concrete Pouring
12 of 26
Poured Slab
13 of 26
Foundation Wall Forms
14 of 26
Foundation Walls
15 of 26
TVA Building D3: Foundation Walls
16 of 26
Foundation Walls
17 of 26
Floor Pad
18 of 26
View of D3 Foundation
19 of 26
D3 TVA 10.31
20 of 26
D3 Exterior 11.7
21 of 26
D3 work 11.14
22 of 26
D3 12.12
23 of 26
02.27 TVA D3
24 of 26
Construction Update TVA D3 April 2022
25 of 26
Construction update on TVA D3 4-18-22.PNG
26 of 26
Construction Update TVA D3(2) 4-18-22
1
of
26