New TVA Buildings - D2 and D3

Project Summary
Construction
Completion Date: Summer 2022
Temple View Apartment Buildings D2 and D3 are two of the three structures for the first phase of the New Temple View Apartment project. These two buildings have the same structure like in the new TVA Building A1, with a little difference in the exterior. Like the new TVA Building A1, Buildings D2 and D3 were also constructed of insulated concrete forms (ICF) that overcome many of the challenges of the existing construction.
Each of these new TVA buildings contains 18 one-bedroom units (including one ADA-compliant unit) with ten two-bedroom units (including one ADA-compliant unit). All units have a refrigerator, stove/oven, microwave, washer/dryer, and ceiling fans.
Construction Gallery
D2 Building
1 of 38
TVA D2: Leveling
February 5, 2021 - Leveling

2 of 38
TVA Building D2 Slab Preparation.png
February 15, 2021 - Slab Preparation

3 of 38
TVA Building D2: Plumbing Excavation
February 22, 2021 - Plumbing Excavation

4 of 38
TVA Building D2: Overall
February 22, 2021 - Plumbing Excavation

5 of 38
TVA Building D2: Plumbing
March 1, 2021 - Plumbing Installation

6 of 38
TVA Building D2: Plumbing Excavation
March 1, 2021 - Plumbing Installation
7 of 38
Building D2: Aerial
March 8, 2021 - TVA Building D2 Construction Progress

8 of 38
TVA D2: Elevator Pit
March 15, 2021 - Elevator Pit

9 of 38
New TVA Building D2: Plumbing Backfilled
March 15, 2021 - Plumbing Backfilled

10 of 38
TVA Building D2: Overall
March 22, 2021 - The Base is Being Prepared for Slab Placement
11 of 38
Building D2: Elevator Pit Finished
March 30, 2021 - Elevator Pit Finished
12 of 38
Preparing the Mat Slap
April 2, 2021 - Mat Slab Preparation
13 of 38
Termite Barrier
April 12, 2021 - Mat Slab Preparation Progress and Termite Barrier Construction
14 of 38
Termite Barrier
April 20, 2021 - Termite Barriers Completed

15 of 38
TVA Building D2: Preparing Slab for Placement
April 12, 2021 - Preparing Slab for Placement

16 of 38
TVA Building A1: Barrier and Rebar
April 12, 2021 - Preparation for Placement of Concrete
17 of 38
TVA Building D2: Slab Preparation
April 28, 2021 - Slab Preparation

18 of 38
TVA Building D2: Concrete Layer
May 4, 2021 - Pouring Concrete Slab
19 of 38
Concrete Placement in Process
May 11, 2021 - Concrete Placement in Process
20 of 38
TVA Building D2: New Update
May 21, 2021 - Concrete Slab Has Been Completed
21 of 38
TVA Building D3: New Update
May 21, 2021 - Leveling
22 of 38
Floor Slab
June 1, 2021 - Floor Slab
23 of 38
TVA Building D2: Steel Structure
June 11, 2021 - Steel Structure are Erected on the Building's Base
24 of 38
TVA Building D2: Level 1 Walls
June 21, 2021 - First Level Insulated Concrete Form (ICF) Walls Construction
25 of 38
TVA Building D2: Level 1
June 21, 2021 - First Level ICF Walls Progress
26 of 38
Stairs and Elevator Shaft
July 7, 2021 - Stairs and Elevator Shaft
27 of 38
ICF Walls
July 13, 2021 - ICF Walls Construction Update
28 of 38
Structure and Elevator Shaft
July 20, 2021 - Structure and Elevator Shaft

29 of 38
Floor Joist
July 28, 2021 - Second Floor Joist Installation
30 of 38
TVA Building D2: Wall Progress
August 4, 2021 - Second Floor ICF Walls Progress
31 of 38
ICF Blocks
August 8, 2021 - CMU Elevator is Being Built and ICF Blocks are Being Laid
32 of 38
Main Sensor
August 20, 2021 - Elevator Main Sensor Installation and Second Floor Progress
33 of 38
Aerial view of the D2 Complex
August 27, 2021 - Aerial View of the Progress of TVA Building D2

34 of 38
D2 Crane Work
September 26, 2021 - Third Floor Walls Completed and Roof Installation Progress
35 of 38
D2 Exterior 11.7
November 7, 2021 - TVA Building D2 Exterior Work Progress
36 of 38
02.27 TVA D2 Exterior & Pavilions
February 27, 2022 - The Exterior Has Been Updated with Yellow and Pink Siding, and the Roof was Fully Installed
37 of 38
Construction Update TVA D2 and Pavilions 4-18-22
April 18, 2022 - Landscaping is in Process
38 of 38
Construction Update TVA D2 April 2022
April 18, 2021 - TVA Building D2 is Nearly Completed
1
of
38
D3 Building
1 of 26
New TVA Building D3
March 30, 2021 - Excavating for TVA Building D3 Foundation
2 of 26
Excavation #1
April 2, 2021 - Excavation Progress

3 of 26
Excavation #2
April 2, 2021 - Excavation Progress
4 of 26
TVA Building D3: Excavation
April 20, 2021 - Excavation Progress
5 of 26
Excavation and Leveling
May 11, 2021 - Excavation and Leveling
6 of 26
Preparing Mat Footing
June 1, 2021 - Preparing Mat Footing
7 of 26
Another Layer of Gravel
June 11, 2021 - Another Layer of Gravel
8 of 26
TVA Building D3: Base
June 21, 2021 - Gravel Layer has been Leveled
9 of 26
TVA Building D3: Exterior Work
June 29, 2021 - Slab Placement
10 of 26
Fabric and Rebar
July 7, 2021 - Fabric and Rebar Installation
11 of 26
Preparation for Concrete Pouring
July 13, 2021 - Preparation for Concrete Pouring
12 of 26
Poured Slab
July 20, 2021 - Concrete Slab Completed and Walls Construction has Begun
13 of 26
Foundation Wall Forms
July 28, 2021 - Foundation Wall Forms Installation
14 of 26
Foundation Walls
August 8, 2021 - First Level Foundation Walls Completed
15 of 26
TVA Building D3: Foundation Walls
August 4, 2021 - First Level Foundation Walls Progress
16 of 26
Foundation Walls
August 8, 2021 - First Level Foundation Walls Completed
17 of 26
Floor Pad
August 20, 2021 - Floor Pad Has been Poured
18 of 26
View of D3 Foundation
August 27, 2021 - Framing Preparation
19 of 26
D3 TVA 10.31
October 31, 2021 - Framing and Elevator Shaft Construction are on the Process
20 of 26
D3 Exterior 11.7
November 7, 2021 - TVA Building D3 Construction Progress
21 of 26
D3 work 11.14
November 14, 2021 - Framing Work on the Third Level Has Begun
22 of 26
D3 12.12
December 12, 2021 - Installation of the Wooden Frames for the Roof is in Process
23 of 26
02.27 TVA D3
February 27, 2022 - Windows and Railings for the Staircases and Walkways Have Been Installed
24 of 26
Construction Update TVA D3 April 2022
April 18, 2022 - TVA Building D3 Progress
25 of 26
Construction update on TVA D3 4-18-22.PNG
April 18, 2022 - TVA Building D3 Progress
26 of 26
Construction Update TVA D3(2) 4-18-22
April 18, 2022 - TVA Building D3 Progress