New TVA Building - A1

Project Summary
Construction
Completion Date: February 2022
The new TVA Building A1, part of phase one of the new TVA housing project, finished construction in February 2022. It is located between the Teacher Education Building and the newly constructed Mikionele Way extension. It is constructed of insulated concrete forms (ICF) that will overcome many of the challenges of the existing construction. This building contains 28 units of three varying layouts — 18 one-bedroom units (including one ADA-compliant unit) with ten two-bedroom units (including one ADA-compliant unit).
Construction Gallery

1 of 46
TVA Bldg A1-Plumbing excavation and Installation
November 23, 2020 - Plumbing Excavation and Installation
2 of 46
New TVA Building: Overall Site
January 8, 2021 - Leveling

3 of 46
Elevator Excavation
January 18, 2021 - Elevator Excavation

4 of 46
Elevator Pit
January 6, 2021 - Elevator Pit
5 of 46
TVA A1 Elevator: Wooden Form
February 2, 2021 - Elevator Wooden Form
6 of 46
TVA A1: Wooden Form #1
February 5, 2021 - Elevator Wooden Form Progress

7 of 46
TVA Building A1: Overall
February 22, 2021 - Mat Slab Preparation
8 of 46
New TVA Building A1: Aerial Shot
March 8, 2021 - Mat Slab Completed

9 of 46
TVA Building A1: Gravel placed on the mat slab
March 15, 2021 - Gravel Placed on the Mat Slab

10 of 46
TVA Building A1: Slab Placement
March 22, 2021 - Slab Placement
11 of 46
TVA Building A1: Pouring Concrete Slab
March 30, 2021 - Pouring Concrete Slab
12 of 46
TVA Building A1: ICF Walls
April 2, 2021 - Insulated Concrete Form (ICF) Walls are Being Built

13 of 46
ICF Walls
April 2, 2021 - Insulated Concrete Form (ICF) Walls
14 of 46
ICF Walls #2
April 12, 2021 - Construction of ICF Walls Progress

15 of 46
ICF and Steel Columns
April 12, 2021 - Steel Columns Have Been Mounted

16 of 46
TVA Building A1: Interior Framing Started
April 12, 2021 - Interior Framing Started
17 of 46
TVA Building A1: ICF Walls
April 20, 2021 - One-Story ICF Walls
18 of 46
TVA Building A1: Second Floor
April 28, 2021 - Construction of the ICF Walls on the Second Floor of the Building
19 of 46
TVA Building A1 Update Photo
May 4, 2021 - TVA Building A1 Construction Progress
20 of 46
The Floor of Third Level
May 11, 2021 - Construction of the Floor of the Third Level Has Started
21 of 46
TVA Building A1: The Floor of Third Level
May 11, 2021 - Closer Look at the Progress of the Construction
22 of 46
TVA Building A1: New Update
May 21, 2021 - The Third Floor of the Building is Being Constructed
23 of 46
Third Level Walls
June 1, 2021 - Third Level Walls Progress
24 of 46
TVA Building A1: Trusses
June 11, 2021 - Trusses are Being Constructed
25 of 46
TVA Building A1: Roof Trusses
June 21, 2021 - Roof Trusses
26 of 46
TVA Building A1: Exterior Work #1
June 29, 2021 - Roof Installation
27 of 46
Shingles and Plumbing
July 7, 2021 - Shingles Installation
28 of 46
Shingles and Electrical
July 7, 2021 - Plumbing and Electrical in the First and Second Floor is Completed
29 of 46
Shingles
July 13, 2021 - Shingles Installation Progress
30 of 46
Shingles and Siding
July 13, 2021 - TVA Building A1 Construction Progress
31 of 46
Overall Update Photo
July 20, 2021 - Roof and Shingles Installation Completed
32 of 46
Exterior Siding
July 20, 2021 - Exterior Siding
33 of 46
Exterior Siding
July 28, 2021 - Exterior Siding Progress

34 of 46
Columns
July 28, 2021 - TVA Building A1 Construction Progress
35 of 46
TVA Building A1: Exterior Progress
August 4, 2021 - TVA Building A1 Exterior Progress
36 of 46
Drywall: Floors 2 and 3
August 8, 2021 - Drywall Installation on the Second and Third Floor
37 of 46
Second Floor Drywall
August 20, 2021 - Second Floor Drywall Progress
38 of 46
Wainscoat and Landscaping
August 20, 2021 - Waistcoat and Landscaping Preparation
39 of 46
A1 Parking Lot Prep 9.26
September 26, 2021 - TVA A1 Building Construction Progress
40 of 46
A1 Exterior 10.31
October 31, 2021 - Railings for the Walkways Have Been Installed and Pavement Has Been Poured and Smoothed
41 of 46
A1 Exterior 11.7
November 7, 2021 - Parking Lot has been Paved and Rolled and the Front Exterior is Nearly Finished
42 of 46
A1 Front 11.14
November 14, 2021 - The Parking Lot is Painted to Establish the Parking Stalls
43 of 46
TVA A1 Exterior 12.12
December 12, 2021 - Railing for the Exterior Staircases is still to be Installed and Landscape Work is in Process
44 of 46
02.06 A1 Exterior
February 6, 2022 - Final Touches are Being Done
45 of 46
02.27 A1
February 27, 2022 - The Building is Completed and All the Landscaping was Installed
46 of 46
TVA A1 Building Exterior
Finished TVA A1 Building.