Na Hale Kumu Area B - Temple Court
![Current Project at BYUH](https://brightspotcdn.byu.edu/dims4/default/8b4a255/2147483647/strip/true/crop/600x450+0+0/resize/600x450!/quality/90/?url=https%3A%2F%2Fbrigham-young-brightspot-us-east-2.s3.us-east-2.amazonaws.com%2Ff6%2F3f%2Fd3a5fef84629bb9f41eef070985b%2Fnhkareabjpg.jpg)
Project Summary
Construction
Completion Date: September 2020
The two duplexes at the Temple Court located across the street from the temple had been demolished to be replaced by two new duplexes. These duplexes have four-bedroom/three-bathroom units. These units are equipped with a refrigerator, stove/oven, microwave, dishwasher, and dryer.
Construction Gallery
![](https://brightspotcdn.byu.edu/b9/3e/7b57f79748c9a0878e3bdcf1c821/na-hale-kumu-area-b-temple-court-7.1.19.jpg)
1 of 36
Na Hale Kumu Area B Ground Preparation
July 8, 2019 - Na Hale Kumu Area B Ground Preparation
![](https://brightspotcdn.byu.edu/6b/44/2aa8760242519adb5def2cd607b7/concrete20footings204.jpg)
2 of 36
Current/Concrete20Footings204.jpg
August 1, 2019 - Ground Excavation
![](https://brightspotcdn.byu.edu/34/68/7fd04f51406b9a8bc8a69c5bfedb/concrete20footings202.jpg)
3 of 36
Current/Concrete20Footings202.jpg
August 1, 2019 - Concrete Footings
![](https://brightspotcdn.byu.edu/22/11/9dd208bc42c7bd5e859468fafc03/area20b20top20down208-7-19.jpg)
4 of 36
Current/Area20B20Top20Down208-7-19.jpg
August 6, 2019 - Construction Progress of Building 12 and 13 in NHK Area B
![](https://brightspotcdn.byu.edu/ec/aa/63f9e3194d429efc8692b22b62a1/building201320ground203208-19-19.jpg)
5 of 36
Current/Building201320Ground203208-19-19.jpg
August 22, 2019 - Concrete Footings Progress
![](https://brightspotcdn.byu.edu/9a/62/ec6531dc4259bece3005b1a37296/building201220ground202208-19-19.jpg)
6 of 36
Current/Building201220Ground202208-19-19.jpg
August 22, 2019 - Wooden Walls Construction
7 of 36
Na Hale Kumu area B
January 22, 2020 - Building 13 Walls are Erected and Building12 Roof is Being Installed
![](https://brightspotcdn.byu.edu/9b/88/8d9067894cc6af04ca417c6b5fa9/building-12-aerial-2-1-22-20.jpg)
8 of 36
Building 12 Aerial 2 1-22-20.jpg
January 22, 2020 - Building 12
Exterior and Interior walls have been constructed. Roof is being installed. Rough plumbing and electrical are being installed.
Exterior and Interior walls have been constructed. Roof is being installed. Rough plumbing and electrical are being installed.
9 of 36
Building 13 Aerial 1 2-5-20.JPG February 5, 2020 update
February 5, 2020 - Building 13
Exterior walls are being prepared for siding. Windows are being installed.
Exterior walls are being prepared for siding. Windows are being installed.
10 of 36
Building 12 February 5, 2020 Update
February 5, 2020 - Building 12 Walls Update
11 of 36
Building 13 March 4, 2020 Update
March 5, 2020 - Building 13
Sidings are in process. Concrete stairs has been constructed. Roofing is nearly complete.
Sidings are in process. Concrete stairs has been constructed. Roofing is nearly complete.
12 of 36
Building 12 March 4, 2020
March 4, 2020 - Building 12
Sidings are in Process and Roofing Progress
Sidings are in Process and Roofing Progress
13 of 36
Building 13 April 20, 2020 Update
April 20, 2020 - Building 13
Sidings are completed. Windows and stair railings have been installed. Ground preparation for the landscape has been started.
Sidings are completed. Windows and stair railings have been installed. Ground preparation for the landscape has been started.
14 of 36
Building 12 April 20, 2020 Update
April 20, 2020 - Building 12
Sidings are completed. Windows and stair railings have been installed.
Sidings are completed. Windows and stair railings have been installed.
15 of 36
Building 13 May 19, 2020 Update
May 19, 2020 - Building 13
Excavation for Landscape Edging and Electrical Routing is in Process
Excavation for Landscape Edging and Electrical Routing is in Process
16 of 36
Building 12 May 19, 2020 Update
May 19, 2020 - Building 12
Landscape Edging and Excavation for Electrical Routing is in Process
Landscape Edging and Excavation for Electrical Routing is in Process
17 of 36
NHK Area B Asphalt Preparation June 2, 2022
June 2, 2020 - Asphalt Preparation
![](https://brightspotcdn.byu.edu/75/17/ada55218408781aff53fcadd4182/screen-shot-2020-06-22-at-7.12.41%20AM.png)
18 of 36
Overall Site of Area B Townhouses nearing completion.
June 19, 2020 - Asphalt Paving Completed
19 of 36
Building 13 June 23, 2020 Update
June 23, 2020 - Building 13
Side Fencing and Landscape Edging Completed
Side Fencing and Landscape Edging Completed
20 of 36
Building 12 June 23, 2020 Update
June 23, 2020 - Building 12
Side Fencing and Landscape Edging Completed
Side Fencing and Landscape Edging Completed
21 of 36
Building 13 July 22, 2020 Update
July 22, 2020 - Building 13 and Landscaping Completed
22 of 36
Building 12 July 22, 2020 Update
July 22, 2020 - Building 12 and Landscaping Completed
23 of 36
Overall View of Na Hale Kumu Area B
Overall View of Na Hale Kumu Area B
24 of 36
Area B Aerial 2 08-18-2020.JPG
Aerial View of the Completed Na Hale Kumu Area B
25 of 36
Na Hale Kumu: Building 12
Na Hale Kumu Area B: Building 12
26 of 36
Finished View of Building 12 at Temple View NHK area B
Na Hale Kumu Area B: Building 12
![](https://brightspotcdn.byu.edu/97/3c/fafffd9c40d5ac124cf838e0616d/screen-shot-2020-08-20-at-8.47.59%20AM.png)
27 of 36
Overall Site of Building 12
The Back View of Na Hale Kumu Area B: Building 12
28 of 36
Na Hale Kumu: Building 13
Na Hale Kumu Area B: Building 13
29 of 36
Overall View of Building 13
Na Hale Kumu Area B: Building 13
![](https://brightspotcdn.byu.edu/63/2c/a8adcdbc4b80ac0dc09d2c9524f3/screen-shot-2020-08-20-at-8.58.35%20AM.png)
30 of 36
General View of Building 13
Na Hale Kumu Area B: Building 12
![](https://brightspotcdn.byu.edu/cb/74/6717def6456b857c76a618afece0/screen-shot-2020-08-20-at-8.56.23%20AM.png)
31 of 36
The Front Planter is Complete at Building 13
The Front Planter is Complete at Building 13
![](https://brightspotcdn.byu.edu/c5/5f/5d2e7f044b0984ed38f8630546d2/screen-shot-2020-08-20-at-8.50.48%20AM.png)
32 of 36
Bathroom Mirror Installed
Bathroom Mirror Installed
![](https://brightspotcdn.byu.edu/27/8b/7c6299cf4cd9a5c9f2a1f1e73114/screen-shot-2020-08-20-at-8.51.02%20AM.png)
33 of 36
Cleaning Completed at townhouse Building 12
Cleaning Completed at Building 12
![](https://brightspotcdn.byu.edu/8d/ba/b551b341415dae3a02bde4d4e694/screen-shot-2020-08-20-at-8.56.09%20AM.png)
34 of 36
All Appliances are Installed at Building 13
All Appliances are Installed at Building 13
![](https://brightspotcdn.byu.edu/e6/03/ac42b19142b1a5bb6b093b500cc3/screen-shot-2020-06-19-at-10.10.39%20AM.png)
35 of 36
Faculty duplex kitchen Sink
Kitchen Sink at Building 13
![](https://brightspotcdn.byu.edu/65/31/a62cd8394eb8826de97ebfe7ed39/screen-shot-2020-06-19-at-10.11.05%20AM.png)
36 of 36
Typical Shower Fixture with Adjustable Shower Head
Building 13: Typical shower fixture with adjustable shower head