![A drawn map of Na Hale Kumu Area A. Naniloa Loop is on the right-hand side and the TVA entrance next to Townhouses is right below the Na Hale Kumu houses. Jersey barricades placement is marked along the TVA entrance next to Townhouses and Naniloa Loop. The orange mesh fence placement is marked in the back yard and in front of Townhouse building 7 and 8. The construction fence panels removal is marked from the general entrance to the front porch of the Townhouse building 7.](https://brightspotcdn.byu.edu/dims4/default/3b08b0c/2147483647/strip/true/crop/840x572+0+0/resize/840x572!/quality/90/?url=https%3A%2F%2Fbrigham-young-brightspot.s3.amazonaws.com%2Fba%2F46%2F8ad4c21f4b5387c2175480e649b1%2Farchitectural-site.png)
Project Summary
Construction
Completion Date: October 2020
Located between the Temple View Apartments and the Laie Temple, the Na Hale Kumu Area A Townhouses includes two-bedroom/two-bathroom, three-bedroom/three-bathroom, and four-bedroom/four-bathroom units. All units are equipped with a refrigerator, stove/oven, microwave, dishwasher, washer, and dryer.
Construction Gallery
![](https://brightspotcdn.byu.edu/6c/6c/2dfc55cd4c1ca7f9e7aca528a424/area-a-aerial-10-30-19.jpg)
1 of 43
Town House Project November 13, 2019
October 30, 2019 - Aerial View of Slabs Being Poured at the New Townhouse
![](https://brightspotcdn.byu.edu/a6/b2/e6e9201c447c83b10800605320af/area-a-aerial-2-1-22-20.jpg)
2 of 43
Area A Aerial 2 1-22-20.jpg
November 1, 2019 - Pouring Slabs is in Process and Wall Constructions Have Begun for Buildings 6-8
![](https://brightspotcdn.byu.edu/38/d1/8cb352114629b3d368d11da90589/building-6-aerial-1-22-20.jpg)
3 of 43
Building 6 Aerial 1-22-20.jpg
January 22, 2020 - Exterior walls are Being Constructed
4 of 43
Area A Aerial 1 2-5-20.JPG
February 5, 2020 - Na Hale Kumu Area A Construction Progress
Completed Concrete Slab and Walls Constructions
Completed Concrete Slab and Walls Constructions
5 of 43
Building 8 February 5, 2020 Update
February 5, 2020 - The Wooden Roof Frame is Being Constructed
6 of 43
NHK Area A February 28, 2020 Update
February 28, 2020 - Na Hale Kumu Area A Construction Progress
7 of 43
Building 6 February 28, 2020 Update
February 28, 2020 - Building 6 Interior Wall Frames Construction
8 of 43
Building 8 February 28, 2020 Update
February 28, 2020 - Building 8
Exterior Walls are Being Prepared for Siding. Windows are Being Installed.
Exterior Walls are Being Prepared for Siding. Windows are Being Installed.
9 of 43
The Aerial View of NHK Area A March 11, 2020 Update
March 11, 2020 - Na Hale Kumu Area A Construction Progress
Building 8 Roof and Building 7 Wooden Roof are Near Completion.
Building 8 Roof and Building 7 Wooden Roof are Near Completion.
10 of 43
Building 1 March 11, 2020 Update
March 11, 2020 - Building 1
Interior Wooden Wall Frames Construction
Interior Wooden Wall Frames Construction
11 of 43
Building 8 March 11, 2020 Update
March 11, 2020 - Building 8
Siding Installation is in Process. Roof is Nearly Completion.
Siding Installation is in Process. Roof is Nearly Completion.
12 of 43
The Aerial View of NHK Area A April 7, 2020 Update
April 7, 2020 - Na Hale Kumu Area A Construction Progress
Buildings 6-7 Roofs, Building 1 Wooden Roof are Near Completion. Building 2 Wooden Roof Frames are Being Constructed.
Buildings 6-7 Roofs, Building 1 Wooden Roof are Near Completion. Building 2 Wooden Roof Frames are Being Constructed.
13 of 43
Building 6 April 7, 2020 Update
April 7, 2020 - Building 6
Siding Installation in in Process
Siding Installation in in Process
14 of 43
Building 2 April 7, 2020 Update
April 7, 2020 - Building 2
Wooden Roof is Near Completion
Wooden Roof is Near Completion
15 of 43
The Aerial View of NHK Area A April 22, 2020 Update
April 22, 2020 - Na Hale Kumu Area A Construction Progress
Buildings 1 and 2 Exterior Walls are Being Prepared for Siding Installation
Buildings 1 and 2 Exterior Walls are Being Prepared for Siding Installation
16 of 43
The Aerial View of NHK Area A May 19, 2020 Update
May 19, 2020 - Na Hale Kumu Area A Construction Progress
Solar Panels Have Been Installed on the Roofs of Buildings 6-8 and 1.
Solar Panels Have Been Installed on the Roofs of Buildings 6-8 and 1.
17 of 43
Building 2 May 19, 2020 Update
May 19, 2020 - Building 2
Siding Installation is in Process and Windows Have Been Installed
Siding Installation is in Process and Windows Have Been Installed
18 of 43
Building 4 May 19, 2020 Update
May 19, 2020 - Building 4
Exterior Wall and Roof Construction Progress
Exterior Wall and Roof Construction Progress
19 of 43
The Aerial View of NHK Area A June 17, 2020 Update
June 17, 2020 - Na Hale Kumu Area A Construction Progress
Most of the Exterior Walls and Roofs are Completed for All Buildings
Most of the Exterior Walls and Roofs are Completed for All Buildings
20 of 43
Building 6 June 17, 2020 Update
June 17, 2020 - Building 6
The Construction of the Exterior is Almost Completed
The Construction of the Exterior is Almost Completed
21 of 43
Building 5 June 17, 2020 Update
June 17, 2020 - Building 5
Siding Installation is in Process
Siding Installation is in Process
22 of 43
The Aerial View of NHK Area A July 22, 2020 Update
July 22, 2020 - Na Hale Kumu Area A Construction Progress
Solar Panels Have Been Installed on the Roof of All Buildings
Solar Panels Have Been Installed on the Roof of All Buildings
23 of 43
Building 1 July 22, 2020 Update
July 22. 2020 - Building 1
The Construction of the Exterior is Completed
The Construction of the Exterior is Completed
24 of 43
Building 7 July 22, 2020 Update
July 22, 2020 - Building 7
The Construction of the Exterior is Completed
The Construction of the Exterior is Completed
25 of 43
The Aerial View of NHK Area A August 18, 2020 Update
August 18, 2020 - Na Hale Kumu Area A Construction Progress
Drainage Basin Construction Begun
Drainage Basin Construction Begun
26 of 43
Overall View of Na Hale Kumu Area A
September 2, 2020 - Na Hale Kumu Area A Construction Progress
Landscaping and Fencing Have Been Started
Landscaping and Fencing Have Been Started
27 of 43
Na Hale Kumu: area A, Building 1
September 2, 2020 - Building 1
Landscaping and Fencing Preparation
Landscaping and Fencing Preparation
28 of 43
Na Hale Kumu: Area A, Building 3
September 2, 2020 - Building 3
Landscaping and Fencing Preparation
Landscaping and Fencing Preparation
29 of 43
Na Hale Kumu: Area A, Building 8
September 2, 2020 - Building 8
Fencing and Landscaping are Completed
Fencing and Landscaping are Completed
30 of 43
Faculty Townhouses near Naniloa Loop.
September 9, 2020 - Landscaping is in Process
31 of 43
Building 1: Fencing
September 20, 2020 - Building 1
Landscaping and Fencing are in Process
Landscaping and Fencing are in Process
32 of 43
Building 5: Back View
September 20, 2020 - Building 5
Landscaping is in Process
Landscaping is in Process
33 of 43
Building 1: Fencing Complete
September 22, 2020 - Building 1
Landscaping and Fencing are Completed
Landscaping and Fencing are Completed
34 of 43
Building 3: Fencing Work
October 6, 2020 - Building 3
Landscaping is Completed while Fencing is in Process
Landscaping is Completed while Fencing is in Process
35 of 43
Na Hale Kumu Fencing
September 30, 2020 - Na Hale Kumu Area A Construction Progress
Fencing at the Side of the Area is Completed
Fencing at the Side of the Area is Completed
36 of 43
Building 2: Front View
September 30, 2020 - Building 2
Landscape and Fencing are Completed
Landscape and Fencing are Completed
37 of 43
Building 4: Front View
September 30, 2020 - Building 4
Landscaping and Fencing are in Process
Landscaping and Fencing are in Process
38 of 43
Na Hale Kumu: Fencing and Sidewalk
October 6, 2020 - Na Hale Kumu Area A Construction Progress
Fencing and Sidewalk Construction are in Process
Fencing and Sidewalk Construction are in Process
39 of 43
Na Hale Kumu: Drainage Basin
October 6, 2020 - Na Hale Kumu Area A Drainage Basin
40 of 43
Building 3: Fencing Work
October 6, 2020 - Building 3
Landscaping is Completed while Fencing is in Process
Landscaping is Completed while Fencing is in Process
41 of 43
Area A: Complete #1
Completed Na Hale Kumu Area A: Townhouse
42 of 43
Area A: Complete #2
Completed Na Hale Kumu Area A: Townhouse
43 of 43
Area A: Complete #3
Completed Na Hale Kumu Area A: Townhouse
1
of
43